×
The Complex
HCI – HEMISFÉRIO INDUSTRIAL COMPLEX
Hemisfério Industrial Complex is ready to receive both small companies and major industrial companies. It has modern modular warehouses, built based on high quality standards, generous ceiling heights of up to 13 m that provide more vertical space, floors with a bearing capacity of up to 25 t/m2, and the option of using gantry cranes. For more convenience and better security of the tenants, the facility has a restaurant, snack bar, bathrooms, an access control system, and 24-hour surveillance. The logistics facility also hosts one of the most modern industrial dry ports in the country: the Granbel Industrial Dry Port.
AREA
Total area of ≈ 400,000 m2, with built-up area of ≈ 162,000 m2.
PARKING
Garage building with up to 1,000 parking spots.
RAILROAD YARD
Internal mixed-gauge extension of ≈ 5 km connected to the entire national railway network, operated by the FCA and MRS railway concessionaries.
CONVENIENCE
There are plans to operate a restaurant, a pharmacy, a book store, a fast food restaurant, banking services, beauty services, a car wash, a tire service, alignment and balancing shop.
FIRE PROTECTION SYSTEM
Approved by the Fire Department with an AVCB certificate, in compliance with the international NFPA standard.
SECURITY
24-hour security and access control. 24-hour maintenance and security service.
ENVIRONMENT
Basic infrastructure to obtain an environmental license from the competent authorities.
WATER
Water is supplied by COPASA (Companhia de Saneamento de Minas Gerais); the water tank capacity is 870 m3.